The Order a Kitchen Refurbishment Is Done In
The order is: check and fix the units, first-fix any electrics, hang the doors, fit the worktop with the sink and tap, do the splashback, then paint the walls. Each step covers the edge of the one before. Get it backwards and something new is cut, chipped or redone.
Seven steps, and what goes wrong out of order.
Free, no obligation. One local company prices it, not five.
- 7 stepsin order
- Units firstpaint last
- One companyto run it
Seven steps
- Units checked. Level, square, dry. Any bad unit swapped.
- Electrics, first fix. Cables for under-unit lights and new sockets.
- Doors and drawer fronts. Resprayed or new, with hinges, runners and handles.
- End panels, plinths, cornice. To match.
- Worktop. With the sink, tap and hob.
- Splashback. Tiles or an upstand, sealed to the worktop.
- Paint. Walls and ceiling last.
What goes wrong out of order
| Done too early | What happens |
|---|---|
| Tiles before the worktop | The new top sits lower or higher, and a gap or a cut row shows |
| Paint before the splashback | Tile adhesive and grout mark it |
| Worktop before the units are levelled | Stone cracks, laminate joints open |
| Doors before a leaking unit is found | New doors on a box that's failing |
One company, or several
A refurbishment touches a fitter, sometimes a sprayer, a worktop fabricator, an electrician and a tiler. One company that runs all of it keeps the order right. That is who we pass you to.
Every guide, calculator and county page
Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.
Price & Specification Guides
Calculator, FAQ & Glossary
More on refurbishing a kitchen
Costs, doors, worktops and timing.
What it costsFrom a €700 respray to €5,000 for doors and a worktop.
Replacement doorsMade to measure for your units, from €48 a door.
A new worktopLaminate €800 to €2,000. Quartz €2,200 to €4,800.
Refurbish or replace?Five checks on the units you have.
The small partsHandles and soft-close hinges, €150 to €450.
Ten changes, by costWhat makes the most difference for the least.Kitchen refurbishment in every county
- Carlow44% of homes built 1991 to 2010
- Cavan50% of homes built 1991 to 2010
- Clare42% of homes built 1991 to 2010
- Cork38% of homes built 1991 to 2010
- Donegal48% of homes built 1991 to 2010
- Dublin32% of homes built 1991 to 2010
- Galway48% of homes built 1991 to 2010
- Kerry42% of homes built 1991 to 2010
- Kildare48% of homes built 1991 to 2010
- Kilkenny41% of homes built 1991 to 2010
- Laois50% of homes built 1991 to 2010
- Leitrim48% of homes built 1991 to 2010
- Limerick39% of homes built 1991 to 2010
- Longford47% of homes built 1991 to 2010
- Louth41% of homes built 1991 to 2010
- Mayo43% of homes built 1991 to 2010
- Meath48% of homes built 1991 to 2010
- Monaghan39% of homes built 1991 to 2010
- Offaly42% of homes built 1991 to 2010
- Roscommon44% of homes built 1991 to 2010
- Sligo43% of homes built 1991 to 2010
- Tipperary39% of homes built 1991 to 2010
- Waterford40% of homes built 1991 to 2010
- Westmeath46% of homes built 1991 to 2010
- Wexford48% of homes built 1991 to 2010
- Wicklow37% of homes built 1991 to 2010
Price your refurbishment
Four taps: the doors, the worktop, the size and any extras. You see our price guide for it. Your number is only asked for at the end, if you want one kitchen company that covers your county to ring you.
Questions people ask
Doors or worktop first?
Doors, usually, so the worktop goes on last and isn't worked over.
When is the floor done?
A new floor that runs under the plinth goes down before the plinths are fitted. Otherwise, any time.
When do appliances change?
With the worktop, if a hob or sink is changing. Freestanding ones, any time.